Audit Evidence Preparation

When a customer or a certification body reviews a vision station, the questions are predictably shaped: who decided what acceptable means, does the system actually do that, does anybody confirm it still does, and what has been changed since. Nearly all of it can be answered from records that exist — provided somebody kept them. The uncomfortable position is not having done the work badly; it is having done it and being unable to show it.

Diagram of the four documents and the chains connecting them

Key takeaways

  • Four documents answer the audit: criteria, validation, change record, monitoring.
  • Three chains have to be walkable: part to record, record to criteria, criteria to approver.
  • The change record is the one most often missing, and the one most often asked for.
  • Build the evidence as you go — reconstructing it later is expensive and unconvincing.
Isometric diagram of an industrial camera and an edge computing box connected by a single cable
The station-level hardware: one industrial camera plus one edge computing box

Audit questions follow a fixed route: you say you do this, do you in fact do it, how do you know you are still doing it, and did you still do it after you changed something. Applied to a vision system, that route needs four documents and three traceability chains. A well prepared site can put the relevant paper in an auditor's hand within a minute or two of the question. A site that is not prepared ends up explaining verbally, and a verbal explanation is not evidence.

The four documents

What the audit asks for, and where it usually falls short
DocumentContentsAnswersUsual gap
CriteriaWhat is acceptable and what is not, its source, who approved it, when it took effectOn what basis do you judgeNo approval signature, or the version differs from what the line is using
ValidationWhich sample set was used at acceptance, what the results were, who confirmed themHow do you know it worksReport exists but the sample list cannot be found, so it cannot be reproduced
Change recordWhat was altered, why, how it was verified afterwards, who approved itDoes it still hold after the changeChanges live in chat messages and never became a record
MonitoringCheck sheets, reference sample readings, review records, exception handlingHow do you know it still follows the criteriaRecords exist but are discontinuous or cannot be searched by date

The change record is the one most often missing, for an understandable reason. Adjusting a parameter on a vision station is quick and feels trivial — a threshold, an exposure, a light repositioned, a few minutes of work. Whoever does it does not experience it as a change. To an auditor it is a change to how the criteria are implemented, and it needs a record and a re-validation. A typical finding reads "provide records of all parameter changes to this system in the last twelve months, together with verification after each change", and if that cannot be produced, the quality of the other three documents will not save the result.

The three chains

  • From a part to its record. The auditor picks up a work in progress or a lot number and asks how it was judged and where the result is. The station has to produce the record for that part, or failing that for that lot, immediately. This chain tests retrieval, not criteria.
  • From a record to the criteria. Starting from a record, the auditor asks which version of the criteria was in force. That means each record has to carry a criteria version or effective date. Many sites record results but not versions, and the chain stops here.
  • From the criteria to the approver. Starting from the criteria document, the auditor asks who approved this revision, on what basis, and whether the customer acknowledged it. This needs a signature on the revision and, where applicable, a customer acknowledgement tied to that version.

Questions that catch people out

  • "Did you define these criteria, or did the customer?" There needs to be a clear answer about the source. If it was defined in house, be ready to explain the basis — process requirements, customer specification, industry practice — and whether the customer is aware of it. Vagueness invites further digging.
  • "When did the system last get something wrong, and what did you do?" This tests exception handling. "It never has" is not usually accepted and suggests nobody is watching. The stronger answer is the record of an exception: how it was found, what was affected, what was done and what prevents a repeat.
  • "If someone else operated this tomorrow, would they get the same result?" This is about standardisation, and it calls for operating instructions, evidence that parameters are controlled, and training records — which is where the alignment training above becomes audit evidence.
  • "How many times has this system been changed, and did the results shift?" Straight at the change record. The number of changes is not the issue; the absence of records is.

Common questions about audit preparation

Is any of this needed if we have no customer audits?

There are reasons beyond audits. The same four documents are what handover, fault investigation and staff rotation depend on. A system only its author can operate becomes a black box the moment that person moves on, which costs more than an audit finding. Treat them as the station's manual, and the audit becomes a side benefit.

How long must the records be kept?

Whichever is longer between the customer contract and any applicable regulation, which generally follows the product traceability requirement. That requirement is usually far longer than intuition suggests — automotive, medical and energy products commonly run beyond ten years. For the layering and retrieval strategy, see inspection record retention.

Does every parameter change really need recording?

The answer is to record at a sensible granularity rather than not at all. Split changes into two classes. Those that affect the criteria — thresholds, algorithms, lighting geometry, camera position — must be recorded and verified. Those that do not — screen layout, log paths, comment text — need only a simple entry. Write the classification into the operating instructions and the daily burden is small.


What will your auditor ask for?

Tell us your customer's audit requirements and what records you keep today. We will identify the documents to add and where the chains break.

Contact us

Related articles

View all

Need specific advice for your production line?

Our engineers can share practical approaches to process error prevention and SOP compliance inspection for your scenario.

Request a free trial plan